North East Link, Melbourne
The audit team assessed the permanent-state design for the new shared paths associated with freeway adjustments.
Gateway Upgrade, Sydney
The project was considering installing a continuous rail with a decorative element into the surface of the ATL (shared path).
The rails would have been composed of a stainless-steel surface intended to be flush with adjacent pavement.